Practical guidance · Site surveillance

Detect relevant events. Reduce false alarms with evidence.

A depot is not a laboratory. Traffic, weather and changing usage are everyday realities. Effective perimeter protection accounts for them and connects detection, verification and response.

Have your site assessed

Combine sensors according to their role

Fence and entrances

Fence sensors detect mechanical disturbance. Access control identifies authorised movement. Both require clearly defined zones and operational rules.

Video, radar and LiDAR

Video provides visual context; other sensors add position or movement. Suitability depends on visibility, range, surroundings and interfaces.

VMS, PSIM and control room

Alerts are associated with a location, time window and response plan. The control-room workflow must support decisions, not simply produce more alerts.

False-alarm cause matrix

CauseActionVerification
Vegetation, animals, weatherKeep fence lines and views clear; review detection zones and object classes.Test day, night, wind and changing light.
Reflections and headlightsAdjust camera angles, backlighting and analytics regions.Test entrances with real vehicle movements.
Vibration and fence workCheck sensor mounting, sensitivity and operating hours.Document operational disturbance separately from controlled climbing tests.
Unsuitable alarm rulesCorrelate alerts by zone and time; verify video before escalation.Evaluate detection rate and false alarms together.

What should be measured at acceptance

  1. Define test zones and protection objectives; document positive and negative tests.
  2. Record detected and missed test events for each zone.
  3. Evaluate false alarms per zone and operating time, for example per 24 operating hours.
  4. Measure time from detection through verification to the agreed response.
  5. Test power, network and sensor failures; document fallback and recovery.

Acceptance thresholds are agreed before testing. Low false-alarm counts are not a success if real events are also missed.

Practical context: commercial site in Saxony

An approved ASG project example describes a commercial site in Saxony. It provides context for matching existing equipment, site layout and alarm workflows. Public before-and-after false-alarm metrics are not available for this example.

Approved project examples →